Oshodi-Abule Egba BRT Corridor To Be Ready In May

0
DCIM100MEDIADJI_0004.JPG

Governor Babajide Sanwo-Olu of Lagos State has beamed a special focus on the ongoing construction BRT corridor from Oshodi to Abule Egba. The 13.68 kilometre-long route will be completed in May, this year, Sanwo-Olu disclosed while inspecting the project on Sunday.

L-R: Commissioner for the Environment & Water Resources, Mr. Tunji Bello; Lagos State Deputy Governor, Dr. Obafemi Hamzat; Governor Babajide Sanwo-Olu; Managing Director, LAMATA, Engr. (Mrs) Abimbola Akinajo; Special Adviser to the Governor on Works and Infrastructure, Mrs. Aramide Adeyoye and Permanent Secretary, Ministry of Works and Infrastructure, Engr. Olujimi Hotonu, during an inspection of the ongoing construction of the Oshodi-Abule Egba BRT Corridor on Lagos-Abeokuta Expressway on Sunday, January 12, 2020.
L-R: Commissioner for the Environment & Water Resources, Mr. Tunji Bello; Lagos State Deputy Governor, Dr. Obafemi Hamzat; Governor Babajide Sanwo-Olu and Managing Director, LAMATA, Engr. (Mrs) Abimbola Akinajo

The ongoing construction of Oshodi-Abule Egba BRT Corridor on Lagos-Abeokuta Expressway

Construction work has resumed on the project, which was started under the last administration. The project is being handled and supervised by the Lagos Metropolitan Area Transport Authority (LAMATA).

Upon completion, Sanwo-Olu said the project was expected to bring relief to residents, as it is expected to ease transportation challenges along the route.

The Governor said over 200 mass transit buses would be deployed to the corridor for immediate operations, pointing out that additional buses would be delivered based on the assessment of traffic situation and utilisation.

He said: “This BRT corridor was conceived with the intention to address congestion and transportation challenges along the Oshodi-Abule Egba corridor. We are fully back on this project and we are pushing the contractor to step up the pace of work on it. Once it starts operation, this will significantly bring relief and reduce traffic congestion and transportation problems along this route.

“We are hoping that by the end of May, we should complete the entire Phase 1 of the BRT infrastructure along this route. The work has been pushed up and there entire project is about 75 per cent to completion. The rest of the construction activities to be done include completion of bus shelters, rigid pavements and terminals.”

Sanwo-Olu said the Government had started to address some impediments slowing down the construction work on the path, which, he said, included a blocked drainage network along the route. The Governor said desilting of the identified drain channels at Katangowa market would be done to pave the way for completion work on the BRT lane.

READ  Sanwo-Olu Congratulates President-Elect, Tinubu At 71

The ongoing Phase 1 of the project will have 14 bus stations between Abule Egba and Oshodi. Five of the stations are bilateral, facing both sides of Expressway; nine medium stations. Also, streetlight facilities will be installed on the route in addition to pedestrian bridges being built along the path.

The Governor also said the Government would be acquiring land to build mega bus depots for the BRT vehicles to be deployed to the area.

After the completion of the first phase, Sanwo-Olu disclosed that work would commence on Phase II of the project, which will stretch from Abule Egba to Sango, later this year.

“The extension of the BRT corridor to Ogun State border is part of the solutions we are bringing to address traffic congestion along Lagos-Abeokuta Expressway and reduce it to the barest minimum. This will create a robust transportation model for our residents living in border towns.”

The Governor warned against indiscriminate dumping of refuse on the BRT corridor, stressing that the Government would not condone one-way driving along the route.

READ  Actor Gabriel Afolayan Raises Alarm
L-R: Lagos State Governor, Mr. Babajide Sanwo-Olu, addressing residents and traders at Super bus stop during an inspection of the ongoing construction of the Oshodi-Abule Egba BRT Corridor on Lagos-Abeokuta Expressway

Leave a Reply